Run tests

You have designed your test scenario, and now you are ready to run it. When you run a test in NeoLoad, a replay of the recorded scenario takes place. The replay has amplified parameters of load and length, which helps you take necessary actions to ensure the application is stable and productive.

This quick start guide demonstrates how you can run tests.

Run a test

To run a test, follow these steps: 

  1. In the NeoLoad Controller, open your project. Click Runtime.

  2. In the Scenarios tab, choose a scenario and a Population for the test. Specify the test parameters (length, load, number of Virtual Users, and so on).

  3. To launch the test, choose Run > Start playing. Enter the name and description of your test. Click OK.

    Note: Before running a test, it is strongly advised to close the antivirus installed on the Load Generator machine. Keeping the antivirus alive may alter the relevancy of the test results.

  4. In the Runtime Overview tab, follow the general performance of the test.

  5. In the Runtime Graphs tab, select the graphs of specific interest with drag-and-drops.

  6. In the Runtime Errors tab, select a raised running error to view its description.

  7. In the Runtime Alerts tab, select a raised server or SLA alert to view its description.

  8. In the Runtime Users tab, watch the Virtual Users used in the test.

  9. At the end of the test, NeoLoad automatically display the Results section.

Learn more

For more information on test execution, check out these topics: