Testing Velocity
This report provides a rollup of time per Test Execution to a Test Suite / Cycle / Build / Release and the difference between the planned and actual time.
The Summary with Latest Information section shows the latest information of execution time, as follows.
-
Total Planned Time: Sum of planned execution time of all the Test Run Logs in the selected Report Settings.
-
Total Actual Time: Sum of actual execution time of all the Test Run Logs in the selected Report Settings.
-
Planned Time: Sum of planned execution time of all the latest Test Logs of Test Runs in the selected Report Settings.
-
Actual Time: Sum of actual execution time of all the latest Test Logs of Test Runs in the selected Report Settings.
The Data Grids contains a detailed report of Test Execution Time displayed in the Summary section.