Manager 10.1.9 Release Notes

October 20, 2020

Jira integration enhancement

The Jira Integration has been enhanced to allow more than 100 characters for the Jira password connection for qTest. Previously, qTest had a limitation that prevented a Jira password connection with more than 100 characters. This limitation is now removed. By default, Jira allows passwords with 255 characters and you can configure the maximum length of your password.

Access test logs for the Get Test Runs API

New fields have been added to the response body of the Get Test Runs API to allow you to access the test logs for this API. The Execution Start Date Time, Execution End Date Time, and Test Log ID fields have been added to the response body to display information about the most recent test log.

Bug fixes

Ticket # Component

Description

INC0207377 CI Tool Integration Previously, when the CI Tool Integration was enabled, the POST Test Runs API required the CI Tool key/value in all requests creating a Test Run. This is now resolved.
INC0273776 Test Log Attachments An issue is fixed for Test Log Attachments not downloading when exporting Test Run results. The export file for these attachments said "This attachment hasn't been scanned yet. Please try to export again later."
N/A Quick Run Grid An issue is fixed where the incorrect Assigned to user displayed on the Quick Run Grid for Test Runs.
INC0251535 Jira Integration Some customers experieinced issues where auto-filling Test Step description, expected result, and actual result in the description field of a Jira issue when using the JEditor add-on. This is now resolved.

INC0272134

Notification Settings An issue is fixed where custom Notification Events for Test Runs were not working as expected.